NAVITRONIC Plus® Delivers Excellent Performance
The 3D system developed by VÖGELE uses the project’s digital survey data to guide the paver along the planned route.
Over the Alps with NAVITRONIC® Basic and Swiss Precision
NAVITRONIC®, the innovative System for 3D Machine Control of VÖGELE pavers, is getting increasingly established throughout the world.
70% Higher Laydown Rate Thanks to NAVITRONIC Plus®
Above all on airport sites, time is a critical factor. The faster a job needs to be completed, the smoother aviation operations can proceed. The time saved on reconstruction of the runway at Zweibrücken Airport was particularly impressive.
VÖGELE Paver Provides for Perfect Evenness
Test drivers and vehicle developers will soon be able to make tyres scream when
they test new vehicle components to the limit at the “Aldenhoven Vehicle Testing
Centre” near Aachen, Germany.
SUPER 1800-2 Rehabilitates Runway and Landing Strip at Airport in Iceland
On the job site in Iceland, the use of NAVITRONIC Plus® yielded major advantages: without 3D machine control, reference wires would have had to be installed.
Construction of Motorway without Tensioned Wire but with Swiss Precision
NAVITRONIC Plus® the 3D System for Machine Control, guides the SUPER 2100-2 towards highly accurate paving results.
Easy and Accurate: Grade and Slope Control with 2 Big MultiPlex Skis
How to build a road true to line and level without an existing reference ? The Big MultiPlex Ski, VÖGELE’s sensor system for grade and slope control, was fitted to a SUPER 1900-2 and helped achieve a perfect paving result when rehabilitating a rural road in Germany.
NAVITRONIC® Plus Cuts Costs and Boosts Productivity
When closing the gap on the German A26 motorway by new construction of a section in the Hamburg area, NAVITRONIC® Plus, the 3D Machine Control System offered by VÖGELE, performed excellently.
VÖGELE Actively Supports Up and Coming Sports Talent
The hockey team of Mannheim Athletic and Sports Club called and VÖGELE answered. A paving team delegated by VÖGELE built an absolutely even asphalt base in a new hockey hall to provide the youth hockey team with better training conditions.