Reconstruction of the surface course at Büchel Air Base. Read more

“Hot on Hot and to Hot”
“Hot on Hot and to Hot”

Rehabilitation of airport runway at record time with two InLine Pave trains. Read more

Top Quality
Top Quality

Pavement rehabilitation of the runway at Bremen City Airport, Germany. Read more

Spray Paver in Norway
Spray Paver in Norway

It was the first time that a SUPER 1800-2 with SprayJet Module was used together with NAVITRONIC Plus. Read more

Team of Four Paves "Hot to Hot"
Team of Four Paves "Hot to Hot"

Equipped with high compaction screeds and multi-cell sonic sensors, the team of four pavers placed the new binder course and wearing course in strips, 5 to 6m wide, “hot to hot”. Read more

Braunschweig-Wolfsburg Airport
Braunschweig-Wolfsburg Airport

A new SUPER 3000-2 was used to this end, and handled the task in the shortest time thanks to its large pave width. Read more

VÖGELE Laser Receiver
VÖGELE Laser Receiver

Construction of the New Quito International Airport is currently the largest building project in Ecuador. The airport operator has invested USD 600 million in the modern infrastructure, and the requirements on evenness of the runway and taxiways were every bit as high as the sum involved. Read more

Higher Laydown Rate
Higher Laydown Rate

Above all on airport sites, time is a critical factor. The faster a job needs to be completed, the smoother aviation operations can proceed. The time saved on reconstruction of the runway at Zweibrücken Airport was particularly impressive. Read more

New Standards: VISION 5200-2
New Standards: VISION 5200-2

Ohio State University Airport in the USA looks back on a long tradition, having already served as a training facility for military and civilian pilots since as far back as 1943. Reconstruction of the asphalt pavement was called for to ensure that flight safety could be guaranteed in the future, too. The supreme requirement in this respect was maximum evenness of the pavement. And this is why contractor Shelly & Sands Inc. opted for a VISION 5200-2. Read more

SUPER 1800-2 at Airport in Iceland
SUPER 1800-2 at Airport in Iceland

On the job site in Iceland, the use of NAVITRONIC Plus® yielded major advantages: without 3D machine control, reference wires would have had to be installed. Read more

Before the North Pole
Before the North Pole

Flights from Oslo and Tromsø are the most important link to Norway's Svalbard islands, which lie north of the Arctic Circle. Aircraft take off and land on the world’s most northerly runway located near the largest settlement on the group of islands, the town of Longyearbyen. Read more