Site Reports SB 250 Fixed-Width Screed

High Laydown Rate of 4,200 Tonnes per Shift

The job site on the German A 48 motorway between Ochtendung and Mayen was a master stroke of productivity: a SUPER 2100-2 worked across a width up to 12.5m at a top pave speed of 4.5m/min.

Reconstruction of Motorway in Full-Road Width Across 12m

When reconstructing a 5km stretch of the A 61 motorway in Rhineland-Palatinate, Germany, a SUPER 2100-2 paved two new lanes including hard shoulder in full-road width.

NAVITRONIC® Plus Cuts Costs and Boosts Productivity

When closing the gap on the German A26 motorway by new construction of a section in the Hamburg area, NAVITRONIC® Plus, the 3D Machine Control System offered by VÖGELE, performed excellently.

The tracked SUPER 2100-2 Places Super Quiet Overlay on Motorway

The volume of traffic on Germany’s motorways is growing from year to year and with it the associated noise emission. At the same time, new residential areas are being built ever closer to carriageways and motorways.

10 VÖGELE Pavers Build a 90km Stretch on Europe’s Largest Road Construction Site

Poland’s A1 motorway currently represents the largest road construction project in Europe. RoadNews first reported on this project in Issue 09, when asphalt works had just begun. Great progress has since been made on the first 90km long stretch of the motorway.