Site Reports SUPER 2500

The Première on the A48 Motorway, Germany, was a Success

A VÖGELE SUPER 2500 paves in full-road width and shortens construction period by 3 weeks.

Approximate Temperature 130°C: SUPER 2500 Paves Low-Temperature Asphalt

A SUPER 2500 was on the scene on the A7 motorway near Schleswig, Germany, when the contractor Eurovia built a 5.6km long section in record time.