VÖGELE SUPER 1900 with AB 590 Extending Screed in TP2
Version Paves in Full-Road Width (6m).
Large Roundabout, Manual Work
Reduced to a Minimum
Building Site:
In the course of new construction of the B50 Federal highway,
German contractor Schnorpfeil GmbH & Co. KG of Rheinland-Pfalz
paved a large roundabout with four access points at Altrich.
Geometry:
Outer Radius up to 20m; Inner Radius 14m
Construction:
The accesses to the roundabout required paving in asymmetrical
width, which calls for very precise planning of the paver’s
action. The shapes of the sections need to be determined accurately
beforehand and marked on the ground in order to ensure building
in exactly the right places. At these points it may be helpful
to use mechanical shovels and front end loaders to support
the paving team and reduce manual work.
Paver:
The maximum pave width was 6m, a job which could have been
done by either a wheeled or a tracked paver. The contractor
Schnorpfeil chose the tracked SUPER 1900 with AB 590 Extending
Screed in TP2 version. For added traction, the SUPER 1900’s
Screed Assist function (25bar) was used. This way turning
of the radius was no problem at all. Pave speed was 4m/min.,
the pressure bars operated at 60bar, the tamper was set to
40% of its maximum speed. Steering was by potentiometer. The
paver came with the VÖGELE NIVELTRONIC Automated Grade
and Slope Control System.