A
VÖGELE SUPER 1900 with AB 575 Extending Screed in TP1
Version on a Building Site at Hockenheim.
The Giant Chelsea Bun
Building Site:
Next to the racing track at Hockenheim, Germany, drivers are
testing their ability in the traffic safety centre. A contract
was let by the ADAC (German Automobile Club) and Motodrom-Besitz
GmbH for a roundabout to be constructed on their land so that
in future drivers can pick up a trick or two during driving
safety training.
Geometry:
Outer Radius 36m; Inner Radius 4m
Slope: 1.5 %towards the outside
Construction:
The roundabout is so enormous that 7 strips were required
and, as such, German contractor Bickhardt Bau AG decided on
the spiral construction, which allows a homogeneous and high-quality
circular surface to be built. A wedge-type starting point
had to be paved first. Starting from this wedge, a VÖGELE
SUPER 1900 paved the roundabout just like a “Chelsea
Bun” – without a stop from the inside to the outside.
This kind of paving prevents joints, which would have been
inevitable had paving been carried out in closed circles.
Mix:
100 kg/m² of fine-graded asphaltic
concrete (grain size 0/8).
Paver:
VÖGELE SUPER 1900 with AB 575 Extending Screed in TP1
version. Pave speed was 4m/min., the pressure bar operated
at 50bar, the tamper was set to 30% of its maximum speed.
In order to optimize turning of the radius, steering was by
potentiometer. Two HAMM DVO 6 rollers followed for extra compaction
by rolling.
back
|